🚨🚨 EMERGENCY PLUMBER LONDON — Available 24/7Call 07391 418 640
Home/HIU Repair London/HIU Replacement
HIU Replacement & Installation

HIU Replacement London
New Installation Specialists

When repair is no longer the answer. We replace and install Heat Interface Units across London — all major brands, free survey, fixed-price quote, same-day installation.

Old, unreliable or condemned HIU? Obsolete parts? We will survey your property, recommend the right replacement and install it cleanly with full commissioning and warranty.

Gas Safe Reg No: 217785 Same-Day Install 12-Month Warranty
HIU unit installed in a London flat ready for replacement assessmentNew HIU internal components after installation and commissioning

HIU units we replace and install across London

Free

Survey & Quote

No obligation

1 Day

Installation

Most jobs

2–5 Yr

Manufacturer Warranty

On new units

30+

HIU Brands

All manufacturers

Time to Replace?

Signs You Need an HIU Replacement

HIUs typically last 15–20 years. If your unit is approaching or past that age, replacement is often more cost-effective than continued repairs. Here are the signs to look out for:

Your HIU is over 15 years old and parts are becoming obsolete
Repairs are becoming frequent and increasingly expensive
The manufacturer no longer supports your HIU model
Hot water performance has degraded significantly despite servicing
The unit is noisy, inefficient and costing more in heat network charges
Your HIU has been condemned or failed a safety inspection
You are refurbishing a property and want a modern, efficient unit
The heat network has been upgraded and your old HIU is incompatible

Benefits

Why Replace Your Old HIU?

Improved Efficiency

Modern HIUs are significantly more efficient, reducing your heat network energy consumption and bills.

Manufacturer Warranty

New HIU installations come with a full manufacturer warranty — typically 2 to 5 years parts and labour.

Parts Availability

A new HIU means parts are readily available for years to come — no more obsolete components or long waits.

Reliable Hot Water

Enjoy consistent, reliable hot water and heating without the constant risk of breakdowns.

How It Works

Our HIU Replacement Process

A clear, structured process from survey to commissioning. No surprises, no hidden costs.

1

Free Survey & Assessment

We visit your property, assess the existing HIU, pipework and connections, and identify the best replacement options for your heat network and flat layout.

2

Fixed-Price Quote

You receive a transparent, fixed-price quote covering the new HIU, all materials, labour, commissioning and documentation. No hidden costs.

3

Scheduling

We agree a date that works for you. Most HIU replacements are completed in a single day, minimising disruption to heating and hot water.

4

Removal & Installation

Our engineer safely isolates and removes the old HIU, installs the new unit, connects all pipework and commissions the system to manufacturer specification.

5

Commissioning & Testing

We balance flow rates, set temperatures, verify the DHW and heating circuits, check for leaks and ensure the new HIU performs to specification.

6

Documentation & Warranty

You receive the commissioning certificate, manufacturer warranty registration, user instructions and a full digital job report.

For Managing Agents

Block-Wide HIU Replacement Programmes

Managing a block with multiple ageing HIUs? We provide phased replacement programmes for property management companies and housing associations — survey, schedule, replace and document across your entire portfolio.

  • Full block survey and condition assessment
  • Phased replacement scheduling to suit budgets
  • Tenant access coordination
  • Volume pricing for multiple units
  • Complete compliance documentation pack
Discuss a Programme
HIU internal components showing condition assessment for replacement

FAQs

HIU Replacement FAQs

Book a Free HIU Replacement Survey

Fixed-price quote. Same-day installation. Full warranty.